LOBBY
LOBBY

Location:  New York, New York

Services Performed: Construction Manager where the manager becomes the constructor

Architect: Smith-Miller + Hawkinson

Year of Completion:  Primary build out 1991, subsequent build outs, 1994, 1996, 1998, 2000, 2001, 2003, 2006.

Budget: 4.5 million for primary build out in 1991

Project Size:  60,000 SF

Special Design Features / Comments:

The diverse program for this independent film company includes screening rooms, various types of offices from open plan to executive, conference rooms and state-of-the art teleconferencing spaces. Diverse formal structures are used; folded ceiling plates, displaced volumes, and disjunctive operations articulate the plan. The glazed clerestory mediates between ceiling and plan. Aligned and nonaligned systems - volume and plane, material and color - contribute to a visual fabric that offers workers and visitors diverse impressions and “points of view.” The ceiling plates are sloped to maximize the window views at the building perimeter. In this way, a connection is made to the surrounding urban fabric, and the insularity of the private office space is challenged.  Description by SM + H

Mechanical Systems: 

Building supplied forced air with several 24-hour independent systems for conference rooms and clean room.

 Major Interior Material:  

Cherry veneer, exposed edge apply ply, plaster walls, Norwegian slate, glass, steel, and fabric panels. Original Hollywood movie posters decorate the walls.

STAIR W/ FLOATING CONFERENCE ROOM
STAIR W/ FLOATING CONFERENCE ROOM
OSCAR DISPLAY CASE WITH NON GLASS GLASS
OSCAR DISPLAY CASE WITH NON GLASS GLASS
LOBBY
LOBBY
EXECUTIVE AREA
EXECUTIVE AREA
LOBBY
STAIR W/ FLOATING CONFERENCE ROOM
OSCAR DISPLAY CASE WITH NON GLASS GLASS
LOBBY
EXECUTIVE AREA
LOBBY

Location:  New York, New York

Services Performed: Construction Manager where the manager becomes the constructor

Architect: Smith-Miller + Hawkinson

Year of Completion:  Primary build out 1991, subsequent build outs, 1994, 1996, 1998, 2000, 2001, 2003, 2006.

Budget: 4.5 million for primary build out in 1991

Project Size:  60,000 SF

Special Design Features / Comments:

The diverse program for this independent film company includes screening rooms, various types of offices from open plan to executive, conference rooms and state-of-the art teleconferencing spaces. Diverse formal structures are used; folded ceiling plates, displaced volumes, and disjunctive operations articulate the plan. The glazed clerestory mediates between ceiling and plan. Aligned and nonaligned systems - volume and plane, material and color - contribute to a visual fabric that offers workers and visitors diverse impressions and “points of view.” The ceiling plates are sloped to maximize the window views at the building perimeter. In this way, a connection is made to the surrounding urban fabric, and the insularity of the private office space is challenged.  Description by SM + H

Mechanical Systems: 

Building supplied forced air with several 24-hour independent systems for conference rooms and clean room.

 Major Interior Material:  

Cherry veneer, exposed edge apply ply, plaster walls, Norwegian slate, glass, steel, and fabric panels. Original Hollywood movie posters decorate the walls.

STAIR W/ FLOATING CONFERENCE ROOM
OSCAR DISPLAY CASE WITH NON GLASS GLASS
LOBBY
EXECUTIVE AREA
show thumbnails